Alarm floods are not an operator problem; they are a configuration problem. Benchmarks from ISA-18.2 / IEC 62682 say a healthy system averages about one alarm per operator per ten minutes. Most SCADA systems we audit in Vietnam run ten times that, and operators acknowledge in bulk without reading — including, one day, the alarm that mattered.
Why systems drift into flood
Every integrator adds alarms "to be safe": each transmitter gets HI/HIHI/LO/LOLO by default, each device gets a communication-failure alarm, every pump gets a "not running" alarm even when it is stopped on purpose — and nobody ever removes anything. Ten years later the alarm list is a log, not an alarm system.
The rationalization workflow
- Inventory. Export every configured alarm with its priority and its frequency over the last month. Most SCADA platforms can do this; if yours cannot, we extract it from the alarm database.
- Kill the noise first. The ten most frequent alarms are typically more than half of all annunciations. Fix their deadbands, delays and chattering signals before touching anything else.
- Ask the ISA question of every alarm: what action must the operator take? If there is no action, it is not an alarm — log it as an event instead.
- Set priority by consequence and time to respond, not by instrument type. A high-high level in a chemical tank with a 2-minute response window is high priority; the same level in a buffer tank with hours of margin is low.
- Document each alarm — cause, consequence, operator response — in a master alarm database. This is the document auditors and new operators will ask for.
Configuration mechanics that matter
- Deadband on analog alarms: 1–5 % of range, so a value sitting at the limit does not chatter.
- On-delay for transient-prone signals: 3–15 s, so a pressure spike during pump start does not alarm.
- State-based suppression: do not alarm "low flow" when the pump is intentionally stopped; do not alarm "communication lost" on a device that is switched off for maintenance.
- Shelving with automatic timeout instead of permanent inhibits that nobody remembers to remove.
- Alarm priority distribution target: roughly 80 % low, 15 % medium, 5 % high.
Measure it monthly
Track alarms per operator-hour, the top-ten offenders, standing alarms (active for more than 24 hours) and the priority distribution. Alarm health degrades silently as plants change; a one-page monthly report keeps it honest.
Where the hardware helps
Smart instruments with HART or IO-Link diagnostics let you distinguish "process out of range" from "sensor failing", so the two can be prioritized differently. Managed switches with SNMP make network alarms specific — which port, which link — instead of a blanket "communication lost". Both are cheap compared with the operator attention they save.
We deliver alarm rationalization as a service on Siemens WinCC, Rockwell FactoryTalk, Ignition and other platforms, including the master alarm database — see engineering services. Related: SCADA vs HMI.
Need engineering help with this?
Our engineers apply this to real projects every week — selection, specification, commissioning. Send your question or a part number.
Quick answers
How many alarms per operator is acceptable?
ISA-18.2 and EEMUA 191 benchmarks: about one alarm per 10 minutes per operator in normal operation (around 150 per day) is manageable; more than 10 per 10 minutes sustained is a flood in which important alarms are missed.